– The buyer should schedule regular walk-throughs of the property to make sure the construction matches their vision
– During walk-throughs, the buyer should ask questions and take note of details to ensure the project is progressing as planned
– The final walk-through before closing is a chance for the buyer to make sure everything has been completed, and any missing or defective construction should be noted on a punch list 1. Missing tiles in the bathroom
2. Cracks in the walls
3. Uneven flooring in the kitchen
4. Leaking faucet in the master bathroom
5. Paint touch-ups needed in the living room